Work has the begun on the Foxton to Shepreth part of the path by the A10. The work is scheduled to take about 12 weeks. This is another positive step in creating a continuous high quality path for the people who wish to cycle, walk, run, scoot etc. to and from Trumpington and the places in between or beyond.
For those that wondered, the historic mile stone giving the distance to Cambridge (not far on a bike!) is being sympathetically re-positioned very close to its original location.